Skip to main content

Southern Sydney Freight Line

[dummy-text]











Southern Sydney Freight Line




From Wikipedia, the free encyclopedia






Jump to navigation
Jump to search







Southern Sydney Freight Line

New South Wales Metropolitan Rail Area with Sydney Freight network highlighted in black.
New South Wales Metropolitan Rail Area with Sydney Freight network highlighted in black.

Overview
TypeFreight
Operation
OwnerAustralian Rail Track Corporation


Map of the Southern Sydney Freight Line corridor
Yellow: Route constructed as part of the SSFL project
Green: Existing relief line incorporated into the project
Grey: Existing Metropolitan Goods Railway Line


The Southern Sydney Freight Line (SSFL) is a freight only railway line in the south-western suburbs of Sydney, Australia. The line was constructed to avoid a curfew for freight trains that restricts them from operating in the suburban area during peak hours.


The SSFL forms part of a dedicated freight only corridor between Macarthur and Port Botany. The line is managed by the Australian Rail Track Corporation (ARTC), while the adjacent passenger lines are managed by RailCorp.




Contents





  • 1 Route


  • 2 History

    • 2.1 Construction

      • 2.1.1 Station works




  • 3 Services


  • 4 Future


  • 5 See also


  • 6 References


  • 7 External links




Route[edit]


The SSFL branches from and runs parallel to the Main South line for its full 36 kilometre length from Macarthur to Birrong. The line is an unelectrified, bi-directional single track with 1,800m long passing loops at Glenfield and Leightonfield.[1] Apart from its end points, the SSFL has no interface with the existing network.


From a junction south of Macarthur, the line runs to the west of the existing tracks to Ingleburn where it joins an existing relief line to Glenfield built in the mid-1990s.[2] Just north of Glenfield the line crosses to the east of the existing tracks via a flyover, with future access to the proposed Moorebank Intermodal Terminal.[3] The line continues to parallel the Main South line to Sefton, incorporating the existing Leightonfield Freight loop and sidings. At Sefton Junction, the line passes under the Bankstown line and joins the Metropolitan Goods line which provides access to the Enfield and Port Botany marshalling yards.[4]



History[edit]





Minto station looking north in December 2012 during the final stages of construction


Delays to freight services operating to and from Sydney via the Main South line had long been a problem, but it wasn't until the formation of the National Rail Corporation that any plan was devised to resolve it.[2]


In February 1992, the Federal Government allocated $71m for the construction of a dedicated freight line from Macarthur to Enfield as part of the One Nation infrastructure project. It soon became apparent that to complete the project would cost in the region of $250m. Instead the funding was used to complete a number of smaller projects, including building a 6.6 kilometre relief line between Ingleburn and Glenfield. This single, non-electrified line was used by both CountryLink passenger and freight services.[2]



Construction[edit]


In May 2006, the Australian Rail Track Corporation revived the project.[5][6] Approval was obtained in October 2008 and construction commenced in early 2009, focusing on the section between Cabramatta and Sefton.[1] By August 2009 construction was under way along the whole corridor. In November 2009 poor planning led to the ARTC suspending the project for 10 months while it relocated utilities.[7][8]


In September 2010 the ARTC announced the resumption of the project with an estimated completion date of early 2013.[9][10]


In June 2012, the Sefton Junction to Leightonfield section opened allowing the connection from the yard at the latter to the RailCorp network to be severed.[11] In December 2012, the rest of the line was completed[12] officially opening on 21 January 2013.[13][14]



Station works[edit]




Footbridge extension and new lifts at Minto station


The construction of the new line required modifications to several stations along the route. Minto, Casula, Warwick Farm and Sefton received Easy Access upgrades. A new concourse was constructed at Cabramatta and the footbridge was extended at Leumeah.[1]



Services[edit]


The line is normally only used by freight services, but during engineering possessions on the adjacent RailCorp tracks, NSW TrainLink XPT services have travelled on it. Freight trains travelling to the Minto Container Terminal continue to travel on RailCorp tracks.



Future[edit]


Construction of the Moorebank Intermodal Terminal commenced in April 2017.[15][16] A connection between the SSFL and the terminal will be established.[17]


Transport for NSW is planning to construct a Western Sydney Freight Line and provide a capacity enhancement for the SSFL sometime after 2024.[18]



See also[edit]





  • Rail Clearways Program


  • Northern Sydney Freight Corridor - a similar project in the north

  • Railways in Sydney

  • Transport in Sydney in the 2010s


  • Regional Rail Link - a similar project in Melbourne separating local and long distance services


References[edit]




  1. ^ abc Tackling Congestion on the Sydney Rail Freight Network Archived 27 February 2012 at the Wayback Machine Minister for Infrastructure and Transport 5 February 2009


  2. ^ abc "The Glenfield - Ingleburn Passing Loop Project" Railway Digest August 1994 Page 8


  3. ^ Moorebank Intermodal Terminal Project Department of Finance & Deregulation


  4. ^ Corridor Description Australian Rail Track Corporation Proposal


  5. ^ Southern Sydney Freight Line Parsons Brinckerhoff April 2006


  6. ^ Southern Sydney Freight Line Submissions Report Parsons Brinckerhoff August 2006


  7. ^ "Planning snags halt rail project" Sydney Morning Herald 3 November 2009


  8. ^ "Southern Sydney Freight Line cost blowout" RailExpress.com.au 30 March 2011


  9. ^ Southern Sydney Freight Line Back on Track Australian Rail Track Corporation 14 September 2010.


  10. ^ "SSFL Program of Works" (PDF). ARTC. Archived from the original (PDF) on 25 April 2012. Retrieved 28 October 2011..mw-parser-output cite.citationfont-style:inherit.mw-parser-output .citation qquotes:"""""""'""'".mw-parser-output .citation .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-ws-icon abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center.mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-maintdisplay:none;color:#33aa33;margin-left:0.3em.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  11. ^ SAFE Notice 2-1707 Australian Rail Track Corporation June 2012


  12. ^ "SAFE Notice 2012. Number:2-1821 Enfield West to Glenlee. Commence operation of Southern Sydney Freight Line" (PDF). Australian Rail Track Corporation. 14 December 2012. Archived from the original (PDF) on 9 January 2014. Retrieved 23 January 2013.


  13. ^ Jacob Saulwick (21 January 2013). "'We wanted to make sure we got it right': new rail line opens ... three years late". Sydney Morning Herald. Fairfax Media. Retrieved 21 January 2013.


  14. ^ New Line to Reduce Congestion on Sydney Rail Network Opens Archived 18 January 2015 at the Wayback Machine Australian Rail Track Corporation 21 January 2013


  15. ^ Moorebank construction finally begins Sky News Australia 6 April 2017


  16. ^ Construction begins on Moorebank Logistics Park Minister for Infrastructure & Transport 6 April 2017


  17. ^ Qube's Moorebank intermodal hub a major infrastructure boost ABC News 12 June 2015


  18. ^ "Sydney CBD to Parramatta Strategic Transport Plan" (PDF). Transport for NSW. September 2015. p. 37. Retrieved 18 September 2015.



External links[edit]


  • Australian Rail Track Corporation website

  • Southern Sydney Freight Line Project website









Retrieved from "https://en.wikipedia.org/w/index.php?title=Southern_Sydney_Freight_Line&oldid=843000054"










Navigation menu


























(window.RLQ=window.RLQ||).push(function()mw.config.set("wgPageParseReport":"limitreport":"cputime":"0.352","walltime":"0.488","ppvisitednodes":"value":1690,"limit":1000000,"ppgeneratednodes":"value":0,"limit":1500000,"postexpandincludesize":"value":60191,"limit":2097152,"templateargumentsize":"value":1374,"limit":2097152,"expansiondepth":"value":12,"limit":40,"expensivefunctioncount":"value":4,"limit":500,"unstrip-depth":"value":1,"limit":20,"unstrip-size":"value":20275,"limit":5000000,"entityaccesscount":"value":1,"limit":400,"timingprofile":["100.00% 378.141 1 -total"," 38.66% 146.192 1 Template:Reflist"," 25.49% 96.377 3 Template:Cite_web"," 17.62% 66.619 1 Template:Infobox_rail_line"," 14.91% 56.398 1 Template:Mapbox"," 13.22% 49.990 1 Template:Sidebox"," 11.34% 42.866 1 Template:Railway_lines_in_New_South_Wales"," 10.21% 38.592 1 Template:Navbox_with_collapsible_groups"," 9.68% 36.589 1 Template:Infobox"," 9.57% 36.179 1 Template:Maplink"],"scribunto":"limitreport-timeusage":"value":"0.158","limit":"10.000","limitreport-memusage":"value":4172715,"limit":52428800,"cachereport":"origin":"mw1267","timestamp":"20190420171647","ttl":2592000,"transientcontent":false););"@context":"https://schema.org","@type":"Article","name":"Southern Sydney Freight Line","url":"https://en.wikipedia.org/wiki/Southern_Sydney_Freight_Line","sameAs":"http://www.wikidata.org/entity/Q7430143","mainEntity":"http://www.wikidata.org/entity/Q7430143","author":"@type":"Organization","name":"Contributors to Wikimedia projects","publisher":"@type":"Organization","name":"Wikimedia Foundation, Inc.","logo":"@type":"ImageObject","url":"https://www.wikimedia.org/static/images/wmf-hor-googpub.png","datePublished":"2005-05-23T06:23:53Z","dateModified":"2018-05-26T04:50:45Z","image":"https://upload.wikimedia.org/wikipedia/commons/4/4d/New_South_Wales_metropolitan_rail_area%2C_with_Sydney_Freight_network_highlighted.svg","headline":"railway line in Sydney, New South Wales, Australia"(window.RLQ=window.RLQ||).push(function()mw.config.set("wgBackendResponseTime":110,"wgHostname":"mw1247"););

Popular posts from this blog

𛂒𛀶,𛀽𛀑𛂀𛃧𛂓𛀙𛃆𛃑𛃷𛂟𛁡𛀢𛀟𛁤𛂽𛁕𛁪𛂟𛂯,𛁞𛂧𛀴𛁄𛁠𛁼𛂿𛀤 𛂘,𛁺𛂾𛃭𛃭𛃵𛀺,𛂣𛃍𛂖𛃶 𛀸𛃀𛂖𛁶𛁏𛁚 𛂢𛂞 𛁰𛂆𛀔,𛁸𛀽𛁓𛃋𛂇𛃧𛀧𛃣𛂐𛃇,𛂂𛃻𛃲𛁬𛃞𛀧𛃃𛀅 𛂭𛁠𛁡𛃇𛀷𛃓𛁥,𛁙𛁘𛁞𛃸𛁸𛃣𛁜,𛂛,𛃿,𛁯𛂘𛂌𛃛𛁱𛃌𛂈𛂇 𛁊𛃲,𛀕𛃴𛀜 𛀶𛂆𛀶𛃟𛂉𛀣,𛂐𛁞𛁾 𛁷𛂑𛁳𛂯𛀬𛃅,𛃶𛁼

Crossroads (UK TV series)

ữḛḳṊẴ ẋ,Ẩṙ,ỹḛẪẠứụỿṞṦ,Ṉẍừ,ứ Ị,Ḵ,ṏ ṇỪḎḰṰọửḊ ṾḨḮữẑỶṑỗḮṣṉẃ Ữẩụ,ṓ,ḹẕḪḫỞṿḭ ỒṱṨẁṋṜ ḅẈ ṉ ứṀḱṑỒḵ,ḏ,ḊḖỹẊ Ẻḷổ,ṥ ẔḲẪụḣể Ṱ ḭỏựẶ Ồ Ṩ,ẂḿṡḾồ ỗṗṡịṞẤḵṽẃ ṸḒẄẘ,ủẞẵṦṟầṓế