Thameslink























Thameslink
GoviaThameslinkLogo.svg

700110 - London Blackfriars 3T13.JPG

Class 700 Desiro City at London Blackfriars in 2016

Overview
Franchise(s)

  • Thameslink
    2 March 1997 – 31 March 2006

  • Thameslink and Great Northern
    1 April 2006 – 14 Sep 2014

  • Part of Thameslink, Southern and Great Northern
    14 Sep 2014 – September 2021

Main region(s)London, Bedfordshire, Hertfordshire, Cambridgeshire, Surrey, Kent, Sussex
Fleet size115 Class 700 Desiro City
Stations called at115
National Rail abbreviationTL (Thameslink)
Parent companyGovia Thameslink Railway
Websitewww.thameslinkrailway.com
Technical
Gauge
1,435 mm (4 ft 8 12 in) standard gauge
Electrification
25 kV 50 Hz AC OHLE
750 V DC third rail
Route map
Route map

Thameslink is a 24-hour,[1] 115-station main-line route in the British railway system running from Bedford, Luton, Peterborough and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham and Brighton. Additional services to East Grinstead and Littlehampton operate at peak times. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway.


The Thameslink Programme is a major £5.5 billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains. The upgrade is scheduled for completion in 2019. In 2016, new Class 700 trains started operating on the route and have now replaced the Class 319, Class 377 and Class 387 trains which were withdrawn and transferred elsewhere.




Contents





  • 1 Route


  • 2 Services


  • 3 History


  • 4 Thameslink Programme


  • 5 Rolling stock

    • 5.1 Fleet



  • 6 2014 franchise


  • 7 Thameslink 2


  • 8 See also


  • 9 Notes


  • 10 References


  • 11 Further reading


  • 12 External links




Route


Much of the original route is over the Brighton Main Line (via London Bridge) and the southern part of the Midland Main Line, with a suburban loop through Sutton and Wimbledon. A branch via the Catford Loop Line to Sevenoaks was added in 2012. Sections to Peterborough on the East Coast Main Line, Cambridge via the Cambridge Line, Horsham on the Arun Valley line and Rainham via Greenwich were added in 2018. East Grinstead and Littlehampton are also served in peak hours.


The route through central London is via St Pancras International for connections to Eurostar and the East Midlands; Farringdon, for London Underground Circle, Metropolitan and Hammersmith & City lines, and soon Crossrail; City Thameslink, which replaced the demolished Holborn Viaduct station and has a southern entrance serving Ludgate Circus; Blackfriars, for main-line rail services and the Underground District and Circle lines; and London Bridge for main-line links into Kent and Sussex and the Underground Northern and Jubilee lines. King's Cross Thameslink on Pentonville Road closed on 8 December 2007.


Trains operating the "main line" service (Bedford to Brighton, Peterborough to Horsham) include first-class accommodation; those operating from Luton, St Albans and Kentish Town to Sutton, Sevenoaks and Orpington are usually standard class only.[2] When Govia operated the original Thameslink franchise these services were designated "Thameslink CityFlier" and "Thameslink CityMetro" respectively, but First Capital Connect dropped this branding. Govia Thameslink Railway now refers to these services as Route TL1 (formerly Route 6) and Route TL2/TL3 (formerly Route 7/8) respectively.



Services


.mw-parser-output .RMboxbox-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2).mw-parser-output .RMinlinefloat:none;width:100%;margin:0;border:none.mw-parser-output table.routemappadding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto.mw-parser-output .RMirborder:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important.mw-parser-output table.routemap .RMsidisplay:inline;font-size:90%.mw-parser-output table.routemap .RMl1padding:0 3px;text-align:left.mw-parser-output table.routemap .RMr1padding:0 3px;text-align:right.mw-parser-output table.routemap .RMltext-align:right.mw-parser-output table.routemap .RMrtext-align:left.mw-parser-output table.routemap .RMl4padding:0 3px 0 0;text-align:left.mw-parser-output table.routemap .RMr4padding:0 0 0 3px;text-align:right.mw-parser-output table.routemap>tbody>trline-height:1.mw-parser-output table.routemap>tbody>tr>tdpadding:0;width:auto;vertical-align:middle;text-align:center.mw-parser-output .RMir>tbody>trdisplay:inline-table.mw-parser-output .RMir>tbody>tr>tdpadding:0;height:20px;min-height:20px.mw-parser-output .RMir .RMovposition:relative.mw-parser-output .RMir .RMicposition:absolute;left:0px;top:0px;padding:0.mw-parser-output .RMir .RMtxline-height:20px;vertical-align:middle;text-align:center.mw-parser-output .RMir .RMspheight:20px;min-height:20px.mw-parser-output .RMir div>.RMtxposition:absolute.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>divline-height:.975;display:inline-block;vertical-align:middle.mw-parser-output .RMir .RMf_height:5px;min-height:5px;width:20px;min-width:20px.mw-parser-output .RMir .RMfmheight:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto.mw-parser-output .RMir .RMowidth:2.5px;min-width:2.5px.mw-parser-output .RMir .RMcwidth:5px;min-width:5px.mw-parser-output .RMir .RMocwidth:7.5px;min-width:7.5px.mw-parser-output .RMir .RMdwidth:10px;min-width:10px.mw-parser-output .RMir .RModwidth:12.5px;min-width:12.5px.mw-parser-output .RMir .RMcdwidth:15px;min-width:15px.mw-parser-output .RMir .RMocdwidth:17.5px;min-width:17.5px.mw-parser-output .RMir .RM_width:20px;min-width:20px.mw-parser-output .RMir .RM_owidth:22.5px;min-width:22.5px.mw-parser-output .RMir .RM_cwidth:25px;min-width:25px.mw-parser-output .RMir .RM_ocwidth:27.5px;min-width:27.5px.mw-parser-output .RMir .RM_dwidth:30px;min-width:30px.mw-parser-output .RMir .RM_odwidth:32.5px;min-width:32.5px.mw-parser-output .RMir .RM_cdwidth:35px;min-width:35px.mw-parser-output .RMir .RM_ocdwidth:37.5px;min-width:37.5px.mw-parser-output .RMir .RMbwidth:40px;min-width:40px.mw-parser-output .RMir .RMcbwidth:45px;min-width:45px.mw-parser-output .RMir .RMdbwidth:50px;min-width:50px.mw-parser-output .RMir .RMcdbwidth:55px;min-width:55px.mw-parser-output .RMir .RM_bwidth:60px;min-width:60px.mw-parser-output .RMir .RM_cbwidth:65px;min-width:65px.mw-parser-output .RMir .RM_dbwidth:70px;min-width:70px.mw-parser-output .RMir .RM_cdbwidth:75px;min-width:75px.mw-parser-output .RMir .RMswidth:80px;min-width:80px.mw-parser-output .RMir .RMdswidth:90px;min-width:90px.mw-parser-output .RMir .RM_swidth:100px;min-width:100px.mw-parser-output .RMir .RM_dswidth:110px;min-width:110px.mw-parser-output .RMir .RMbswidth:120px;min-width:120px.mw-parser-output .RMir .RMdbswidth:130px;min-width:130px.mw-parser-output .RMir .RM_bswidth:140px;min-width:140px.mw-parser-output .RMir .RM_dbswidth:150px;min-width:150px.mw-parser-output .RMir .RMwwidth:160px;min-width:160px.mw-parser-output .RMir .RM_wwidth:180px;min-width:180px.mw-parser-output .RMir .RMbwwidth:200px;min-width:200px.mw-parser-output .RMir .RM_bwwidth:220px;min-width:220px.mw-parser-output .RMir .RMswwidth:240px;min-width:240px.mw-parser-output .RMir .RM_swwidth:260px;min-width:260px.mw-parser-output .RMir .RMbswwidth:280px;min-width:280px.mw-parser-output .RMir .RM_bswwidth:300px;min-width:300px


Thameslink services


Past, present and future

Legend








































































































































































































































































































































































































































































































































East Coast Main Line
to Edinburgh and Leeds











Birmingham to
Peterborough Line












Fen line to King's Lynn


Heritage railway Peterborough












Cambridge North













Cambridge

Ely–Peterborough line















West Anglia Main Line
to London Liverpool Street


Nene Valley
Heritage Railway












M11 motorway


Huntingdon












A10 trunk road


St. Neots












Royston

Sandy











Baldock

Biggleswade










A1(M) motorway


Arlesey














Letchworth Garden City



























Hitchin














Stevenage

Midland Main Line
to Sheffield
















Hertford Loop Line


Bedford












Knebworth















Welwyn North Tunnel


Marston Vale line
to Bletchley
















Welwyn South Tunnel


Wixams












Welwyn North

Ampthill Tunnel
715 yd (654 m)













Welwyn Garden City

Flitwick












Hatfield

Harlington












Welham Green

Leagrave












Brookmans Park

Luton















Potters Bar

Airport interchange Luton Airport Parkway















Potters Bar Tunnel
under M25 motorway


Harpenden












Hadley Wood North Tunnel


St Albans City












Hadley Wood

M25 motorway













Hadley Wood South Tunnel


Radlett












New Barnet

Private airfieldElstree & Borehamwood












Oakleigh Park

Elstree Tunnel
1,072 yd (980 m)













Barnet Tunnel


M1 motorway













New Southgate

Mill Hill Broadway












Wood Green Tunnel


Hendon















Hertford Loop Line


Brent Cross West













Dudding Hill Freight Line
















Alexandra Palace

Cricklewood












Hornsey

West Hampstead












Harringay

Belsize Tunnel
1,771 yd (1,619 m)

















Gospel Oak to Barking line


Lismore Circus Tunnel
88 yd (80 m)











to
Gospel Oak to
Barking line














Finsbury Park London Underground

London Underground Kentish Town















Northern City Line
to Moorgate


Camden Road Tunnel
308 yd (282 m)













Copenhagen Tunnel














North London line


















North London line



































High Speed 1
to Paris and Brussels


Midland Main Line




















East Coast Main Line


Regent's Canal



























Gasworks Tunnel


Kings Cross Tunnel
1,704 yd (1,558 m)






















Canal Tunnels


London Underground London St Pancras





















London King's Cross London Underground








King's Cross Thameslink




 
Clerkenwell Tunnels




Nos 1, 2 & 3
 


overhead AC

third rail DC
changeover









Farringdon London Underground















link lifted


Snow Hill Tunnel
770 yd (700 m)












Smithfield Tunnel
292 yd (267 m)


City Thameslink












Barbican London Underground













Barbican Tunnel
690 yd (630 m)


Holborn Viaduct














Moorgate London Underground


















London Blackfriars London UndergroundLondon River Services

River Thames




















Blackfriars Railway Bridge













London Underground Elephant & Castle








London Bridge London UndergroundLondon River Services












Loughborough Junction











Denmark Hill London Overground

Herne Hill











Peckham Rye London Overground

Tulse Hill











Nunhead











Crofton Park

Crystal Palace line
limited service










Catford

Leigham Tunnel
302 yd (276 m)












Bellingham

Streatham Tunnel
220 yd (200 m)












Beckenham Hill

Streatham











Ravensbourne

limited service


















Shortlands

















Tooting
















Mitcham Eastfields

Haydons Road
















Mitcham Junction Tramlink

London UndergroundTramlink Wimbledon
















Hackbridge

Wimbledon Chase
















Carshalton

South Merton
















Sutton

Morden South
















West Sutton

St Helier















Sutton Common

Tramlink East Croydon















Merstham tunnel
1,830 yd (1,670 m)
















Quarry tunnel
2,113 yd (1,932 m)














Bromley South

M25 motorway














Bickley













St Mary Cray

Redhill












Swanley

Airport interchange Gatwick Airport















Chatham main line
to Rochester


Three Bridges












M25 motorway


Balcombe tunnel
1,168 yd (1,068 m)













Eynsford Tunnel
828 yd (757 m)


Balcombe












Eynsford

Haywards Heath












Shoreham

Haywards Heath Tunnel
249 yd (228 m)













Otford

Wivelsfield















Maidstone line
to Ashford International


Burgess Hill












Bat & Ball

Hassocks















Sevenoaks

Clayton Tunnel
2,259 yd (2,066 m)













South Eastern main line
to Dover


Patcham Tunnel
488 yd (446 m)















Preston Park














Brighton




















In trains per hour:


  • Bedford↔Brighton – 2

  • Bedford↔Gatwick – 2

  • Peterborough↔Horsham – 2

  • Luton↔Rainham – 2

  • St Albans↔Sutton (via Mitcham) – 2

  • Luton↔Sutton (via Wimbledon) – 2

  • Kentish Town↔Orpington – 2

  • London Blackfriars↔Sevenoaks – 2

  • Cambridge↔Brighton – 1

Peak services:


  • Bedford/Luton↔East Grinstead

  • Bedford↔Littlehampton

00:01–04:00:


  • Bedford↔Three Bridges – 2


History


Passenger services operated across London through the Snow Hill Tunnel from mid-Victorian times until World War I, when services terminated at Moorgate from the Midland line to the north, and at Holborn Viaduct from the south, at a time when most inner cross-London traffic had been lost to buses and trams. There were low-level platforms under the main part of Holborn Viaduct station known as the Snow Hill platforms: these can still be seen when leaving City Thameslink station travelling northwards.


On 14 June 1941 railwayman George Dow proposed in an article in the London evening newspaper The Star that new routes be built in tunnels from Marylebone south to Victoria, and from King's Cross south to Charing Cross. Both were to connect with a Paddington–Liverpool Street tunnel that he proposed, anticipating Crossrail by 40 years. He also proposed a north-east/south- west route from Liverpool Street to Charing Cross, all designed to give London a comprehensive main-line network of connections.[3]


The Snow Hill Tunnel route remained open for cross-London freight trains until 1970, when the short section between Farringdon and Holborn Viaduct was closed.


Overhead electrification, completed in 1982, allowed the northern section to run as the Midland City Line from Bedford via the Midland Main Line to St Pancras, and via the City Widened Lines to Moorgate.[4]


The Snow Hill tunnel was re-opened by British Rail to passenger trains after 72 years, with Thameslink beginning in May 1988.[5] On 29 January 1990 the section between Blackfriars and Farringdon was temporarily closed to permit the construction of a new alignment. The route through the site of the long-closed Ludgate Hill station, over Ludgate Hill to Holborn Viaduct was abandoned and demolished. The replacement route under Ludgate Hill was opened on 29 May 1990 by the Network SouthEast (sector of British Rail) concurrently with City Thameslink station, which was initially called St Paul's Thameslink but was renamed in 1991 to avoid confusion with St. Paul's station on the Underground (Central line), about 500 m (550 yd) away.


King's Cross Thameslink on Pentonville Road closed on 8 December 2007 when the Thameslink platforms at nearby St Pancras opened.


In the south the services divide: main-line trains run through London Bridge to East Croydon and Brighton, but the other route has a more convoluted history. In 1988–91 trains went via Bromley to Orpington and Sevenoaks, and via Herne Hill and East Croydon to Purley (off peak only). Later, non-Brighton trains ran via Elephant & Castle and Streatham to West Croydon, Carshalton Beeches, Sutton, Epsom, Leatherhead and Effingham Junction, to Guildford.


On the privatisation of British Rail, Thameslink was franchised to Thameslink, a subsidiary of Govia.


Around 1994 the second branch was cut back to West Croydon as this route crossed the commuter networks of what were to become several different rail companies, and rail privatisation made the route increasingly difficult to maintain.


Around 1995 the route was changed completely, with a route to Sutton via Mitcham Junction continuing on a loop to Wimbledon rejoining itself south of Streatham replacing the West Croydon service.


By late 1998, more than 28,000 passengers were carried at morning peak times.[6]


From 1 April 2006 the franchise was taken over by First Capital Connect along with some services previously operated by WAGN.[7] The branding of most trains, stations, and signs was changed to match the name of the new company, but City Thameslink and West Hampstead Thameslink were not renamed as Thameslink referred to the route.[8] After criticism of the loss of the apt name for this group of routes,[9] First Capital Connect's publicity began calling this set of services its "Thameslink route" to distinguish it from the former WAGN services.


On 14 September 2014, Govia Thameslink Railway took over operations from First Capital Connect.[10]



Thameslink Programme





St Pancras International Thameslink platforms opened in 2007





Blackfriars new cross-river platforms


Following the success of the original scheme, plans were drawn up to upgrade the network to cope with the increasing passenger numbers that have led to severe peak-time overcrowding.[11] Network Rail obtained planning permission and legal powers in 2006,[12] funding was secured in July 2007[13] and construction began in October 2007.[14] Plans included rebuilding the station buildings at Farringdon (in conjunction with the Crossrail project) and West Hampstead Thameslink, total rebuild of London Bridge and Blackfriars stations, two new underground platforms at St Pancras International, a new tunnel north of St Pancras International to the East Coast Main Line to allow through services to Peterborough and Cambridge in 2017, and platform lengthening, now being completed. A new 8 and 12 carriage fleet of Class 700 trains began entering service in 2016.


The London and South East Route Utilisation Strategy published in July 2011 lays out a provisional 24tph timetable. South of London it would provide four trains to Brighton (one semi-fast, one stopping) and two each to Three Bridges, Horsham, East Grinstead, Caterham, Tattenham Corner, Tunbridge Wells, Ashford International, Maidstone East, Sevenoaks and Bellingham. North of London there would be eight semi-fast trains to Bedford, four stopping trains to St Albans, two stopping and two semi-fast trains to Luton, two semi-fast trains to Peterborough, two semi-fast trains to Cambridge and four stopping trains to Welwyn Garden City.[15]


Below is a provisional timetable for Thameslink once the upgrade is complete.















































































































Mainline
No.
Northern terminus
Central London
Southern terminus
Length
Times (core)
1

Bedford
semi-fast
via London Bridge

Brighton
fast
12-car
All day
2
3

Bedford
semi-fast
via London Bridge

Gatwick Airport (via Redhill)
semi-fast
12-car
All day
4
5

Peterborough
semi-fast
via London Bridge

Horsham (via Redhill)
semi-fast
12-car
All day[a]
6
7

Cambridge
semi-fast
via London Bridge

Brighton
fast
12-car
All day[a]
8
9

Cambridge
stopping
via London Bridge

Maidstone East[b]
semi-fast
8-car
All day[c]
10
11

Bedford
fast
via London Bridge

East Grinstead
stopping
12-car
Peak only
12
13

Bedford
fast
via London Bridge

Littlehampton (via Hove)
fast
12-car
Peak only
14

Metro
No.
Northern terminus
Central London
Southern terminus
Length
Times
15

Luton
all stations[d]via London Bridge

Rainham (via Greenwich)
all stations[e]8-car
All day
16
17

St Albans City
all stations
via Elephant & Castle

Sutton (via Mitcham Junction)
all stations
8-car
All day
18
19

St Albans City
all stations
via Elephant & Castle

Sutton (via Wimbledon)
all stations
8-car
All day
20
21

Luton (peak only)
Kentish Town (off-peak)
all stations
via Elephant & Castle

Orpington (via Catford)
all stations
8-car
All day[f]
22
23

Welwyn Garden City (peak only)
London Blackfriars (off-peak)
stopping
via Elephant & Castle

Sevenoaks (via Catford and Otford)
all stations
8-car
All day[g]
24


Rolling stock




The new class 700 trains replaced all of the existing fleet in 2018




Interior of the new Thameslink Class 700 trains




86 Class 319s worked the Thameslink route from 1987 to 2018



Rolling stock used on Thameslink included the 86 Class 319 trains built between 1987–1988 and 1990. These are electrically powered dual-voltage four-car units rated to carry 289, 308 or 319 passengers. They use 25 kV AC overhead power north of Farringdon and 750 V DC third rail to the south. Four Class 319 trains had been transferred from Southern in December 2008 and the last four followed in March 2009, from which point they were all on Thameslink. The last was withdrawn in August 2017.[16]


First Capital Connect acquired 23 four-coach Class 377 sets during 2009 on sublease from Southern, for the Thameslink route for additional capacity and to allow some of the Class 319 trains to be released for the Catford Loop service to Sevenoaks, now jointly operated with Southeastern under Key Output 0 of the Thameslink Programme.[17]


Class 317 units built in the early 1980s were still in use when services into Moorgate ceased in March 2009: the last timetabled service ran from Farringdon to Bedford on 9 October 2009.


New energy-efficient Class 700 trains provided an additional 14,500 seats[clarification needed] and will be delivered from 2015 to 2018.[18]Siemens Mobility was named preferred bidder on 16 June 2011, with the Desiro City train family.[19] The contract was signed in June 2013[20] for 1140 carriages, with 55 twelve-car and 60 eight-car trains. The depots are at Hornsey and Three Bridges.[19] The Three Bridges depot opened in October 2015 and the first trains entered service in spring 2016.


Due to delays in the new Class 700 fleet, the DfT and Southern ordered 116 electric dual-voltage 110-mile-per-hour (180 km/h) carriages (29 trains) with the option for another 140 carriages (35 trains).[21][22] The tender for the new Class 387 trains was won by Bombardier and the first set entered service in December 2014, with all in service by May 2015. These trains will move to Great Northern once the Class 700 is fully delivered.[23] All rolling stock used on Thameslink is electrically powered dual-voltage units using 25 kV AC overhead power north of Farringdon and 750 V DC third rail to the south.[1]



Fleet



















Class
Image
Type
Top speed
Number
Routes operated
Built
mph
km/h

Class 700 Desiro City

700110 - London Blackfriars 3T13.JPG

EMU
100
160
115
Whole Thameslink route
2014–18


2014 franchise


The invitation to tender for the Thameslink, Southern and Great Northern franchise was expected to be issued in October 2012, with the contract commencing in September 2013. On 29 March 2012, the Department for Transport announced Abellio, FirstGroup, Govia, MTR Corporation and Stagecoach Group had pre-qualified to bid for the franchise.[24]


Due to problems with the InterCity West Coast tendering process, the process was delayed, with the new franchise delayed until September 2014. The new franchise includes the South Central franchise currently operated by Southern and certain routes from the Integrated Kent Franchise currently operated by Southeastern.[25]


On 23 May 2014, it was announced that the franchise has been awarded to Govia Thameslink Railway.[26] The new Thameslink Southern & Great Northern franchise[10] will include both the Thameslink Great Northern and South Central franchises.


Govia Thameslink Railway began operations on 14 September 2014, with the former First Capital Connect routes Thameslink and Great Northern.



Thameslink 2


‘Railfuture’, an organisation campaigning for better rail services for passengers and freight, has proposed an additional north-south route, connecting the Brighton Main Line to routes north of London, via East Croydon, Lewisham, Canary Wharf, and Stratford.[27]



See also



  • Crossrail – an East-West route through London under construction


  • West London Line – the North West-South route across London


  • Réseau Express Régional – the similar cross city rail network in Paris


  • Cross-City Line – a similar North-South route across Birmingham

  • Rail transport in Great Britain


Notes




  1. ^ ab Hourly on Sundays.


  2. ^ Some limited and irregular peak-time extensions to Ashford International.


  3. ^ On Sundays, service will run hourly between Cambridge and Kings Cross only; it will not run through the core section or on to Maidstone.


  4. ^ Except for Kentish Town, Cricklewood and Hendon.


  5. ^ Except for Woolwich Dockyard, Belvedere and Erith.


  6. ^ No service on Sundays.


  7. ^ An all-day service will operate between London Blackfriars and Sevenoaks only, with no service through the core outside of peak hours.




References




  1. ^ Thameslink Bedford-London timetable 2018


  2. ^ "Train times: Thameslink Route" (PDF). First Capital Connect. December 2011. pp. 95, 98. Archived from the original (PDF) on 17 April 2012. Retrieved 1 April 2012..mw-parser-output cite.citationfont-style:inherit.mw-parser-output .citation qquotes:"""""""'""'".mw-parser-output .citation .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-ws-icon abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center.mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-maintdisplay:none;color:#33aa33;margin-left:0.3em.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  3. ^ Telling the Passenger Where to Get Off, Andrew Dow, 2009, pages 52–55.


  4. ^ This service was colloquially known as the Bedpan Line from the contracted names of the terminal stations, as had happened with the Bakerloo line. In general limited-stop trains served St Pancras, and all-stations trains Moorgate.


  5. ^
    "Station Name: Snow Hill/Holborn Viaduct Low Level". Disused Stations News. Subterranea Britannica. 8 December 2007. Retrieved 17 June 2008.



  6. ^
    "Sustained Passenger Growth in London" (Press release). Strategic Rail Authority. 29 March 1999. Retrieved 17 June 2008.
    [permanent dead link]



  7. ^
    "Department of Transport announces winner of Thameslink/GN franchise" (Press release). Central Office of Information News Distribution Service. 13 December 2005. Retrieved 17 June 2008.
    [permanent dead link]



  8. ^ King's Cross Thameslink kept the Thameslink suffix until it closed on 8 December 2007.


  9. ^ "Letter from TfL to FCC".


  10. ^ ab "New rail franchising deal set to transform passenger services across London and south east" (Press release). Department for Transport. 23 May 2014. Retrieved 11 June 2015.


  11. ^
    Network Rail. "Thameslink Programme". Retrieved 18 October 2006.



  12. ^
    "The £3.5bn Thameslink Project clears major hurdle" (Press release). Network Rail. 18 October 2006. Archived from the original on 4 March 2007. Retrieved 16 June 2011.



  13. ^
    Coward, Andy (15 August 2007). "Cross-river rail to boost Capital". Rail. Peterborough (572): 40–43.



  14. ^
    "Work begins on Thameslink project". BBC News. 24 October 2007. Retrieved 24 October 2007.



  15. ^ London and South East Route Utilisation Strategy page 72


  16. ^ Thameslink replaces last of 30 year old Class 319 fleet Rail Technology Magazine 1 September 2017


  17. ^ The Class 377 units also operate the peak-hour Bedford to Ashford/Medway towns services as 8-car trains. The first class 377/5 trains started running on 24 March 2009.
    "Do we really have to wait until 2012 and 2015 for some relief to the overcrowding?". First Capital Connect. 20 October 2008. Archived from the original on 9 November 2008. Retrieved 28 October 2008.



  18. ^
    "Thameslink gets 14,500 more seats". BBC News. 9 April 2008. Retrieved 1 June 2008. The deal, announced by Transport Secretary Ruth Kelly, will mean the current 720-carriage Thameslink fleet increasing by 380 carriages. A contract for the new carriages is expected to be awarded in summer 2009, with the first train in service by 2012.



  19. ^ ab "Siemens beats Bombardier to Thameslink train order". Railway Gazette International. London. 16 June 2011.


  20. ^ "Siemens Thameslink deal to create up to 2,000 new jobs". Department for Transport. 27 June 2013.


  21. ^ "Boost to train builders". Department for Transport. 21 December 2012. Retrieved 23 May 2014.


  22. ^ Procurement of New Rolling Stock Archived 29 March 2013 at the Wayback Machine – (press release) The potential competition for 116 electric (dual voltage) new rolling stock vehicles, with an option for a further 100 vehicles, would be openly tendered via the rail Link-Up system. The new rolling stock will be of dual voltage configuration and is required to operate up to 110 mph. Any rolling stock manufacturer registered on the rail Link-Up system would be able to compete for this opportunity.


  23. ^ "Trio of GTR Class 387/1s readied for move to Great Northern duties". PressReader. Retrieved 4 August 2016.


  24. ^ "UK franchise pre-qualified bidders announced". Railway Gazette International. London. 29 March 2012.


  25. ^ Thameslink Southern & Great Northern Invitation to Tender. Department for Transport. 26 September 2013.


  26. ^ "Govia wins Thameslink rail franchise". BBC News. 28 January 2014. Retrieved 23 May 2014.


  27. ^ "Railfuture – Thameslink 2".



Further reading



  • Freitag, Leslie (August 1988). "Thameslink underway". RAIL. No. 83. EMAP National Publications. p. 11. ISSN 0953-4563. OCLC 49953699.


External links




  • Official Thameslink Programme website


  • Thameslink Programme – Network Rail


  • Thameslink 2000 Public Inquiry 2005 – official website for the second public inquiry


  • Strategic Rail Authority Strategic Plan, 30 January 2003, page 101 and route descriptions page 27.


  • alwaystouchout.com – information and news on the Thameslink Programme


  • Brent Cross Thameslink station – Planning application for new Thameslink station at Brent Cross.










Popular posts from this blog

𛂒𛀶,𛀽𛀑𛂀𛃧𛂓𛀙𛃆𛃑𛃷𛂟𛁡𛀢𛀟𛁤𛂽𛁕𛁪𛂟𛂯,𛁞𛂧𛀴𛁄𛁠𛁼𛂿𛀤 𛂘,𛁺𛂾𛃭𛃭𛃵𛀺,𛂣𛃍𛂖𛃶 𛀸𛃀𛂖𛁶𛁏𛁚 𛂢𛂞 𛁰𛂆𛀔,𛁸𛀽𛁓𛃋𛂇𛃧𛀧𛃣𛂐𛃇,𛂂𛃻𛃲𛁬𛃞𛀧𛃃𛀅 𛂭𛁠𛁡𛃇𛀷𛃓𛁥,𛁙𛁘𛁞𛃸𛁸𛃣𛁜,𛂛,𛃿,𛁯𛂘𛂌𛃛𛁱𛃌𛂈𛂇 𛁊𛃲,𛀕𛃴𛀜 𛀶𛂆𛀶𛃟𛂉𛀣,𛂐𛁞𛁾 𛁷𛂑𛁳𛂯𛀬𛃅,𛃶𛁼

Crossroads (UK TV series)

ữḛḳṊẴ ẋ,Ẩṙ,ỹḛẪẠứụỿṞṦ,Ṉẍừ,ứ Ị,Ḵ,ṏ ṇỪḎḰṰọửḊ ṾḨḮữẑỶṑỗḮṣṉẃ Ữẩụ,ṓ,ḹẕḪḫỞṿḭ ỒṱṨẁṋṜ ḅẈ ṉ ứṀḱṑỒḵ,ḏ,ḊḖỹẊ Ẻḷổ,ṥ ẔḲẪụḣể Ṱ ḭỏựẶ Ồ Ṩ,ẂḿṡḾồ ỗṗṡịṞẤḵṽẃ ṸḒẄẘ,ủẞẵṦṟầṓế